Today we had a final filming session . We now have all of the footage we need below are some pictures from our last filming session:
Showing posts with label Production. Show all posts
Showing posts with label Production. Show all posts
Tuesday, 20 December 2011
Tuesday, 22 November 2011
London Filming
A week ago we went filming in london for the footage we need for the video. We managed to get around 8 minutes of footage to choose from to put in the video. Some of the locations in london included oxford circus, picadilly circus,embankment and St James' Park.
![]() ![]() |
| Close up on Embankment |
![]() |
| Dancing at Piccadilly circus |
![]() |
| houses of parliament and classic telephone box |
Wednesday, 9 November 2011
Next 'Stage' of Filming.
Today we have filmed the first part of useful footage, after the wasted session a couple of days ago we went away and planned everything to make sure this filming session would be a success. We had guitars and stage permission ready to use as soon as we arrived in school. We had a couple of trial runs to get a performances right. Eventually we managed to get the verses and chorus done so when it comes to editing we have the whole song on the stage we can chose from.
Monday, 7 November 2011
First Filming Session
Today we went to film the stage scene of our music video. When we got down to it we realised how unprepared we were. We had not planned permission or the use of the stage and had to run around to the music department to ask to borrow some guitars. By the time we had everything we needed it was towards the end of the lesson and we had wasted a valuable filming session. We had to plan to film another day.
Saturday, 5 November 2011
Filming timetable
Day | Scene | Location | Cast and Crew | Costumes and Props |
Day 1 | The first verse of the song | On the stage | The main singer – Myles The two guitarists – Rilwan and Billy and Camera Man – Mohammed. | Indie Clothing. Props – Microphone, two guitars. Video camera and camera stand |
Day 2 | The chorus and the scenes where we have fun. | St. James Park Oxford Circus and Embankment (South Bank). | Myles, Rilwan, Billy and Mohammed | Casual Clothing Props – Video camera and stand. |
Day 3 | Bits of the first scene and the chorus. | O2 Arena | Myles, Billy, Rilwan and Mohammed. | Casual Clothing Props – Video camera and stand |
Day 4 | Parts of the song where a female is involved. | On the stage | Myles, Rilwan, Billy, Mohammed and Rebecca. | Indie Clothing Props – Microphone, two guitars, video camera and stand |
Day 5 | Second Verse | On the stage | Myles, Rilwan, Billy and Mohammed | Indie Clothing Props – Microphone, two guitars, video camera and stand |
Day 6 | Second Verse fun scenes | Embankment (South Bank) | Myles, Billy, Rilwan and Mohammed | Casual Clothing Props – Microphone, two guitars, video camera and stand |
Day 7 | Fun scenes | St. James Park and Central London | Myles, Rilwan, Billy and Mohammed | Casual Clothing Props – Microphone, video camera and stand |
Subscribe to:
Posts (Atom)







